Customization: | Available |
---|---|
Condition: | New |
Accessory Code: | A820405000086 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Zoomlion Concrete PumpTransfer Case Three-Axis End Cover Connection Between Transfer Case Housing And 055 Arm PUMP
The installation of the PTO (Power Take-Off) split gearbox oil pump flange in a concrete pump truck involves the following steps:
Positioning: The flange is positioned on the designated mounting area of the PTO split gearbox. It is essential to align the bolt holes on the flange with those on the gearbox to ensure a proper fit.
Mounting Bolts: The flange is secured to the PTO split gearbox using mounting bolts. These bolts are inserted through the bolt holes on the flange and threaded into the corresponding holes on the gearbox. It is important to tighten the bolts evenly and securely to ensure a stable and leak-free connection.
Gasket Placement: A gasket, typically made of a material such as rubber or fiber, is placed between the flange and the gearbox. The gasket helps create a seal and prevents oil leakage at the connection point. The gasket is positioned in such a way that it lines up with the bolt holes on both the flange and the gearbox.
Tightening Bolts: Once the gasket is in place, the mounting bolts are tightened further. It is crucial to follow the specified torque requirements provided by the manufacturer to achieve the proper tightness. This ensures a secure and reliable connection between the flange and the PTO split gearbox.
Inspection: After the flange is installed and the bolts are tightened, a visual inspection is performed to ensure that the flange is properly aligned and there are no signs of misalignment, damage, or leakage. Any issues should be addressed and resolved before operating the concrete pump truck.
It is important to note that the specific installation process may vary depending on the concrete pump truck model and manufacturer's instructions. It is recommended to consult the equipment's manual or seek professional guidance during the installation procedure to ensure proper installation and operation of the PTO split gearbox oil pump flange.
1. who are we?
We are based in Hunan, China, start from 2022,sell to Africa(30.00%),Southeast Asia(30.00%),Domestic Market(20.00%),Mid East(20.00%). There are total about 51-100 people in our office.
2. how can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;
3.what can you buy from us?
concrete pump truck,concrete mixer truck,truck crane,dump truck
4. why should you buy from us not from other suppliers?
In the second-hand construction machinery industry for more than ten years. Specialize in providing all kinds of construction machinery and equipment in original condition, including new and original second hand equipment.
5. what services can we provide?
Accepted Delivery Terms: FOB,CIF,EXW,DAF
Accepted Payment Currency:USD,EUR,CNY;
Accepted Payment Type: T/T,L/C,Cash;
Language Spoken:English,Chinese,Spanish,Arabic,French,Russian